2019 Vermeer D100x140S3 100×140 drill – 1600′ rod, wireline ready, approx. 2400 hrs
Pipe: 1,600 Feet of 3.5 FST 1000 Rod (20 foot lengths) in (8) Drill Rod Baskets.
– 1ea fluted reamer, 1ea tri hawk (new), 1ea 12″ rock reamer (new), 1ea 24″ rocker reamer (new
-Machine is in excellent condition.
-Drill has Wireline Setup / Wireline ready.
-Caterpillar 275HP Tier 4B/Stage 4B Powerplant.
-Operator Cab with Air Conditioning and Heat.
-Automated Rod Loader.
-3-Speed Gearbox (175 FPM, Increased Cycle Time).
-230 GPM Aplex Pump.
-Dual Monitor System with Integrated Aurora Touchscreen.
Available separately:
Meudy Pit pump – model 100KBS46
Stateline 3 phase genset
Digitrak F5+ locator package