Recent work done to drill: , NEW VISE BUSHINGS AND PINS, NEW ROTATION CYLINDER, NEW ROD GUIDE ROLLERS, NEW VISE JAWS, NEW CARRIAGE ROLLERS, REPLACED BEARINGS, SEALS, AND O-RINGS IN GEARBOX. NEW GEARBOX BUSHINGS, REPLACED FRONT AND REAR SLOW DOWN SWITCH, REPLACED ROD BOX FINS, REPLACED ROD INDICATOR HOLDERS, REPLACED MAGNETS ON ROD LOADER ARMS, NEW ROD LOADER ARM SPLINED SHAFT AND HUBS.FIXED ALL HYDRAULIC LEAKS DUE TO BAD O-RINGS, FIXED ALL WORK LIGHTS, NEW LIGHT SWITCH, PUT NEW SEAL IN WATER PUMP. REPAIRED WIRING FOR 2 SPEED.
Tier 3 engine
Ready to go!